Process.

We are here to help.

Design

When remodeling your home, the kitchen is one of the main commitments, both in terms of design and investment. This is why Woodmore Kitchens offers durable, top quality kitchens and, more importantly, with an excellent price/quality ratio. During the initial design stages, our representative will work together with you to help make an informed choice by taking into account all the key factors and all the aspects involved in the decision process, however small or important they may be: arrangement, size, finish, equipment, accessories, etc. You will find a wealth of advice to make your kitchen unique.

ordering

After your custom design is complete and you are ready to order, you will be required to sign a Customer Acceptance Form as well as place a 50% deposit for the purchase of your cabinets. Additionally you will need to provide the following information during the confirmation process: Desired Delivery Date, Appliances- Manufacturer & model numbers, Sinks-Manufacturer & model numbers.

field measure and layout

Once you are ready our representative will come to your home for an exact measurement. Layout Typically, your first set of production drawings will take a minimum of 2 to 4 weeks. After approval, these drawings will be used in the shop to construct your cabinets. It is vital that you respond to questions from the layout team in a timely manner or your delivery and production dates may be affected.

final approval

Final CAD drawings will be reviewed and changed if needed. Any changes to these drawings must be made before your cabinets go into production. After final approval, expect your cabinets to be delivered 4-6 weeks from your last revision. Once your custom cabinet order is processed, any changes made during production will result in additional cost and a delayed delivery date.

Manufacturing and delivery

After final approval, CAD drawings and sketches are sent into the shop for production. The manufacturing and assembly process usually takes only a few weeks to complete. After this time, your custom cabinets will be ready for delivery.At delivery time, our representative will contact you to confirm a delivery date and time. After arrangements have been made, our delivery team will carefully package and transport your cabinets using our own trucks. Upon delivery you will be required to pay the remaining 50% balance.

Installation

New home builders and remodeling contractors generally have an installer they prefer to use. If you need a local referral, we will share the contractor’s names we have worked with in the past. We also provide installation for our cabinets and if requested can to bring our team in to perform the install. Our representative will review additional charges for this service.